The SS called to arrange a meeting last week and we caught up with him, and another supervisor, this morning. Things are progressing and the inspectors had been through, and we needed to discuss any concerns. The Henley team brought to our attention that our bedroom sliding door onto the alfresco opens in the wrong direction. We could see what they meant. As a result, they are going to replace both the sliding door and the painted timber windows. "Done." They also need to rectify some floor tiling. If all goes well, it will only be a small section. If they cannot find a batch match - it will be ALL the tiling in the hallway, family and kitchen areas. In the first scenario, we are looking at maybe 4 weeks till we are given the keys (yay!). Both guys present today were just great, very keen to ensure we will be happy with the house once built; we were pleased to say that we are very happy so far.
Below are the latest offerings for family and friends.
The newly refinished coffee table. Timber effect was done using two different shades of wood gel applied one after the other and three coats of clear.

Second ensuite with shower screens installed.
Main bedroom "dressing room" fit out and ensuite.

No comments:
Post a Comment